Below you will find our standard lead times for all our user interfaces products. You will also find our standard lead times for manufacturing pre-production engineering, product samples, and production parts.

SMART User Interfaces

  • Design & Development Phase: 40-60 working days
    • Dependent on complexity of electrical/firmware requirements
    • Samples: 30 working days
    • Production parts: 30-40 working days
      • Dependent on quantity and material lead times
SMART User Interfac

Membrane Switches

  • Pre-production engineering: 3-5 working days
  • Samples: 25 working days
  • Production parts: 25 working days
Membrane Switch

At a Glance: Lead Times, Samples, & Production Parts

  • Standard lead times support every stage of HMI development, from pre-production engineering and sampling through full-scale production of SMART user interfaces, membrane switches, silicone rubber keypads, and graphic overlays.
  • SMART HMI projects include complete design and development services, with timelines based on electrical, software, firmware, and system complexity requirements.
  • In-house engineering and manufacturing capabilities help streamline development cycles while maintaining consistent production schedules for both prototype and volume manufacturing.

Silicone Rubber Keypads

  • Pre-production engineering: 3-5 working days
  • Samples: 25 working days
  • Production parts: 25 working days
Silicone Rubber Keypad

Graphic Overlays

  • Pre-production engineering: 2-4 working days
  • Samples: 25 working days
  • Production parts: 25 working days
Graphic Overlay

Frequently Asked Questions

Quick Links

What is the standard development timeline for a SMART user interface project?

SMART user interface projects typically require 40 to 60 working days for the design and development phase. Actual timelines depend on the complexity of the electrical, firmware, and system requirements.

How long does it take to receive SMART HMI samples?

Standard sample lead time for SMART user interfaces is 30 working days after the design and development phase has been completed.

What are the production lead times for SMART user interfaces?

Production parts for SMART user interfaces typically require 30 to 40 working days. Lead times can vary based on production quantity and material availability.

How long do membrane switches, silicone rubber keypads, and graphic overlays take to produce?

Membrane switches and silicone rubber keypads generally require 3 to 5 working days for pre-production engineering, followed by 25 working days for samples and 25 working days for production parts. Graphic overlays typically require 2 to 4 working days for pre-production engineering, with 25 working days for both samples and production production orders.

Can lead times vary based on project requirements?

Yes. Lead times may vary depending on factors such as design complexity, electrical and firmware requirements, order quantity, material lead times, and any specialized manufacturing or testing requirements associated with the project.


Need Precision and Speed for Your Next HMI Project?

From samples to production, we will ensure your HMI project moves through manufacturing based on the lead times you need. Don't miss your project deadline, act now!

Request a Quote Request Design Support Request More Information